| 
Step 2: The socle is installed, in this case with a topping piece
that reaches all the way to the wall surface, although commonly
it would not extend that deeply into the mortar. The clamp
holes are cut with their edges on the chalk lines, with the
hole away from the panel.
Previous Image - Next
Image
|